Sustainability and Permitting

Responsible development, on the record

What has been studied, what has been approved, and what comes next at Nevada North. Every statement on this page traces to a Company news release or the technical report.
Sustainability and Permitting

Responsible development, on the record

What has been studied, what has been approved, and what comes next at Nevada North. Every statement on this page traces to a Company news release or the technical report.
Sustainability and Permitting

Responsible development, on the record

What has been studied, what has been approved, and what comes next at Nevada North. Every statement on this page traces to a Company news release or the technical report.

Elko County

Engaging the community at every step

Elko County

Engaging the community at every step

Thoughtful Design

Making efficient use of natural resources

Thoughtful Design

Making efficient use of natural resources

Stewardship

Planning beyond the life of the mine

Stewardship

Planning beyond the life of the mine

Transparent

Nothing published we cannot stand behind

Transparent

Nothing published we cannot stand behind

Our Commitment

Leaving northern Nevada better than we found it

Shared value, responsibly developed

Leaving northern Nevada better than we found it

For us, responsible development goes beyond ticking boxes.

We aim to create lasting jobs, support local businesses, and build strong relationships with neighboring communities. Through thoughtful design and careful use of land, water, and energy, we want to leave a positive legacy that lasts beyond the life of the project.

Permitting

A Disciplined Process, Started Early

A Disciplined Process, Started Early

A Disciplined Process, Started Early

From completed baseline studies and an approved exploration plan, Nevada North is advancing toward mine permitting and a federal Record of Decision, alongside FEL 3 engineering and the Feasibility Study. The program aligns federal and state permitting, environmental baseline work and community engagement to de-risk the next phase of development.

Complete

2023 TO 2024

Environmental baseline studies across the project area: water resources, wetlands and riparian areas, wildlife and vegetation, greater sage-grouse leks, raptor and eagle nests, migratory birds, and a Class III cultural resources inventory.

November 2023

Exploration Plan of Operations and Reclamation Plan submitted to the BLM Wells Field Office and the Nevada Division of Environmental Protection.

February 2024

Revised Plan determined complete by the BLM. All baseline reports and supplemental environmental reports approved.

December 2024

Environmental Assessment posted for a 30-day public comment period.

March 2025

Finding of No Significant Impact and Decision Record authorized phased exploration on up to 250 acres over three years, with concurrent reclamation and bonding.

Underway

2026 drill program

Drilling began in September 2026 under the approved 2025 Plan, continuing into the 2027 drill season. Collects water supply, hydrogeological and geotechnical data alongside resource drilling.

Water

Groundwater monitoring wells, vibrating wire piezometers and surface water instrumentation to build the hydrogeological model the mine plan will rely on.

Wildlife

Annual greater sage-grouse lek surveys and raptor and eagle nest monitoring continuing, as recommended in the technical report.

Reclamation

Disturbed exploration areas reclaimed concurrently as they are no longer needed.

Ahead

Pre-plan of operations

Engagement with the BLM to confirm the mine-stage footprint and the baseline studies required.

Mine Plan of Operations and Reclamation

Plan for concurrent review by the BLM and the Nevada Division of Environmental Protection.

National Environmental Policy Act

Review under the act, anticipated at Environmental Impact Statement level, including Tribal consultation and public comment, toward a federal Record of Decision.

State Permits

Reclamation Permit, Water Pollution Control Permit, Air Quality Permit, Section 401 certification and water rights.

The Mine Plan of Operations has not been submitted or approved. The technical report states that, based on studies to date, the Qualified Person is not aware of any known environmental issues that would preclude development, and that no issues have been identified that are expected to prevent the Company from securing the required permits.

Permitting Timeline

The federal and state pathway

The federal and state pathway

The federal and state pathway

The permitting rows from the project development schedule. Same component, same dates and same source as the Path to Production timeline on the Project page.

EnvironmentAL

Designed for Nevada's regulatory standard

Designed for Nevada's regulatory standard

Designed for Nevada's regulatory standard

Four areas an environmental reviewer will ask about first, and what the Pre-Feasibility Study and the technical report say about each.

Progressive Reclamation

Exploration ground is reclaimed as work advances, with agency-approved native seed mixes supporting revegetation and keeping the active footprint small.

Progressive Reclamation

Exploration ground is reclaimed as work advances, with agency-approved native seed mixes supporting revegetation and keeping the active footprint small.

Water management designed around recycling

Filtered tailings and water recycling reduce fresh water demand in a semi-arid basin.

Water management designed around recycling

Filtered tailings and water recycling reduce fresh water demand in a semi-arid basin.

Dry-Stack Tailings

Tailings are filtered and stored dry rather than held as liquid slurry behind a dam, reducing long-term seepage and containment risk.

Dry-Stack Tailings

Tailings are filtered and stored dry rather than held as liquid slurry behind a dam, reducing long-term seepage and containment risk.

On-site power

An on-site sulfur-burning sulfuric acid plant uses its waste heat to generate most of the site's power, supplemented by a grid connection.

On-site power

An on-site sulfur-burning sulfuric acid plant uses its waste heat to generate most of the site's power, supplemented by a grid connection.

Closure and Restoration

Closure is designed to return the site to its original land use. Disturbed ground is recontoured and revegetated, back to grazing land and wildlife habitat.

Closure and Restoration

Closure is designed to return the site to its original land use. Disturbed ground is recontoured and revegetated, back to grazing land and wildlife habitat.

Water

Filtered tailings and water recycling reduce fresh water demand. Groundwater applications covering Phase 1 needs are filed; further water-saving options will be refined during FEL 3.

Biodiversity and reclamation

Baseline surveys mapped wildlife, vegetation, and sensitive species up to four miles out. Exploration areas are concurrently reclaimed under a bond.

Tailings and waste

Dewatered via filter press, clay tailings are conveyed, spread, and compacted over an HDPE liner, eliminating the need for a conventional dam.

Air and energy

An on-site sulfur-burning sulfuric acid plant uses waste heat and grid power, targeting non-significant source status to support a state waiver.

Water

Filtered tailings and water recycling reduce fresh water demand. Groundwater applications covering Phase 1 needs are filed; further water-saving options will be refined during FEL 3.

Tailings and waste

Dewatered via filter press, clay tailings are conveyed, spread, and compacted over an HDPE liner, eliminating the need for a conventional dam.

Biodiversity and reclamation

Baseline surveys mapped wildlife, vegetation, and sensitive species up to four miles out. Exploration areas are concurrently reclaimed under a bond.

Air and energy

An on-site sulfur-burning sulfuric acid plant uses waste heat and grid power, targeting non-significant source status to support a state waiver.

SOCIAL

Putting Elko County first

Putting Elko County first

Putting Elko County first

Being responsible neighbors in the county and to every community connected to this land.

Jobs

Approximately 2,000 jobs during construction and approximately 350 full-time positions during operations, with further opportunities in transport, maintenance and supplies.

Engagement

A Stakeholder Engagement Plan to seek input from community members, Native American Tribes, local organizations and businesses, elected officials and non-governmental organizations, with feedback considered in the Plan of Operations.

Fiscal

The project would pay Nevada's net proceeds of minerals tax and county property tax, both included in the economic model. Over the life of mine, the PFS estimates approximately US$11.4 billion¹ in federal and state taxes, property tax and royalties.

Land

Federal land administered by the BLM Wells Field Office, plus an 880-acre private land parcel within the project.

¹ The 2026 Pre-Feasibility Study published on October 2, 2026. Read here.

Governance

Listed, reported, reviewed

Listed, reported, reviewed

Listed, reported, reviewed

Lithium X2 Mining Inc. is a reporting issuer listed on the TSX Venture Exchange, the OTCQX Market and the Frankfurt Stock Exchange, with the continuous disclosure obligations that come with each.

Technical Disclosure

All scientific and technical information is reviewed and approved by a Qualified Person under National Instrument 43-101 before release.

Board oversight

Our ESG committee meets quarterly to review environmental, social and permitting matters, with a designated director reporting its findings to the board.

Joint Venture

Nevada North Lithium, LLC is governed by an operating committee under an amended and restated operating agreement between Lithium X2 Mining Inc. and Evolution Mining Limited.

Documents

The record, as filed

The record, as filed

The record, as filed

The permitting and environmental record is public. These are the documents behind this page.

The full investment case, in one place

Corporate presentation, technical reports, filings, stock information and events.

The full investment case, in one place

Corporate presentation, technical reports, filings, stock information and events.

The full investment case, in one place

Corporate presentation, technical reports, filings, stock information and events.

Let's keep in touch

Keep up to date with everything Lithium X2. Get the latest updates on investor news, project progress and company milestones.

Let's keep in touch

Keep up to date with everything Lithium X2. Get the latest updates on investor news, project progress and company milestones.

America is onshoring lithium mining.

Lithium X2 Mining Inc. (TSXV: LIXX | OTCQX: TBD | FSE: DJ5C), a mineral exploration company, is at the forefront of securing the supply of domestic lithium through its active engagement in the Nevada North Lithium Project.

The Project focuses on development of high-grade lithium energy metals in Nevada, USA, a crucial element for powering battery electric storage and electric vehicles. With a primary listing on the TSX Venture Exchange and a listing on the OTCQX Market, Lithium X2 Mining Inc. is strategically positioned as a key player in advancing lithium exploration.

Alan J. Morris, MSc, CPG, of Spring Creek, Nevada, Geological Advisor to the Company and a Qualified Person as defined under National Instrument 43-101, Standards of Disclosure for Mineral Projects, has reviewed and approved the scientific and technical information contained on this website relating to the Nevada North Lithium Project. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. This website contains forward-looking information. See Legal & Disclaimer.

© 2026 Lithium X2 Mining Inc. | All Rights Reserved

America is onshoring lithium mining.

Lithium X2 Mining Inc. (TSXV: LIXX | OTCQX: TBD | FSE: DJ5C), a mineral exploration company, is at the forefront of securing the supply of domestic lithium through its active engagement in the Nevada North Lithium Project.

The Project focuses on development of high-grade lithium energy metals in Nevada, USA, a crucial element for powering battery electric storage and electric vehicles. With a primary listing on the TSX Venture Exchange and a listing on the OTCQX Market, Lithium X2 Mining Inc. is strategically positioned as a key player in advancing lithium exploration.

Alan J. Morris, MSc, CPG, of Spring Creek, Nevada, Geological Advisor to the Company and a Qualified Person as defined under National Instrument 43-101, Standards of Disclosure for Mineral Projects, has reviewed and approved the scientific and technical information contained on this website relating to the Nevada North Lithium Project. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. This website contains forward-looking information. See Legal & Disclaimer.

© 2026 Lithium X2 Mining Inc. | All Rights Reserved

America is onshoring lithium mining.

Lithium X2 Mining Inc. (TSXV: LIXX | OTCQX: TBD | FSE: DJ5C), a mineral exploration company, is at the forefront of securing the supply of domestic lithium through its active engagement in the Nevada North Lithium Project.

The Project focuses on development of high-grade lithium energy metals in Nevada, USA, a crucial element for powering battery electric storage and electric vehicles. With a primary listing on the TSX Venture Exchange and a listing on the OTCQX Market, Lithium X2 Mining Inc. is strategically positioned as a key player in advancing lithium exploration.

Alan J. Morris, MSc, CPG, of Spring Creek, Nevada, Geological Advisor to the Company and a Qualified Person as defined under National Instrument 43-101, Standards of Disclosure for Mineral Projects, has reviewed and approved the scientific and technical information contained on this website relating to the Nevada North Lithium Project. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. This website contains forward-looking information. See Legal & Disclaimer.

© 2026 Lithium X2 Mining Inc. | All Rights Reserved